Every pre-engineered building starts with a cross-section: how wide, how high, and how the roof gets from one side wall to the other. A clear span frame crosses the full width with no internal supports. A multi-span frame, often called a modular frame, rests the rafter on one or more rows of interior columns. Both are standard PEB frame types, both are designed to IS 800:2007 with loads from IS 875 and IS 1893, and both can be built quickly. They give very different buildings to work in, though, and the choice is usually made before anyone has run a single analysis.
If you are new to the PEB system itself, start with what a pre-engineered building is and come back here.
What each frame looks like
Clear span
A clear span frame is a portal: two tapered columns and two tapered rafters meeting at a ridge. The knee (column-to-rafter joint) is the deepest point, because the bending moment is highest there. The floor is completely open between the side walls.
Clear span is the natural choice for:
- warehouses where racking layouts change over time,
- assembly halls and workshops with large equipment or vehicle movement,
- sports halls, aircraft hangars and exhibition spaces,
- any building where a column in the middle would block a crane, a conveyor or a forklift aisle.
Multi-span (modular)
A multi-span frame keeps the same outer columns but adds interior columns at chosen points under the rafter. The rafter usually runs continuously over these supports. In common PEB practice the interior columns are pinned at both ends, so they behave as props and carry mainly axial load. They are often slender built-up or tubular sections.
There are two broad forms:
- Single-gable multi-span: one ridge, one roof slope each side, interior columns underneath. Water drains to the eaves as in a clear span building.
- Multi-gable: several gable roofs side by side, each with its own ridge, joined at valleys. This keeps the roof height low over a very wide building but needs valley gutters.
Multi-span frames suit very wide buildings where some interior columns are acceptable: large storage sheds, cold stores, logistics hubs, and factories where the process runs in bays.
How the two compare
| Aspect | Clear span | Multi-span (modular) |
|---|---|---|
| Interior columns | None | One or more rows |
| Rafter span and depth | Full width; deep at the knee | Shorter spans; shallower rafters |
| Steel weight per m² | Higher for the same width | Usually lower for the same width |
| Floor layout | Completely free | Fixed by the column grid |
| Foundations | Fewer, larger, with large horizontal thrust | More footings; interior ones lightly loaded |
| Sway stiffness | From the portal action of the full frame | From outer columns and the continuous rafter |
| Roof drainage | To eaves only | To eaves, plus valleys in multi-gable roofs |
| Future changes | Easy to re-plan the floor | Columns stay where they are |
Why multi-span frames are lighter
Bending moment in a rafter grows roughly with the square of the span. Cutting a 60 m clear span into two 30 m spans does not halve the moment; it cuts it far more than that. The rafters become shallower, the knee becomes lighter, and the outer columns see less moment from gravity loads.
There are limits to this. The rafter still has to be checked for wind uplift, where the inside flange goes into compression and needs restraint from flange braces. The outer columns still provide most of the lateral stiffness against wind and earthquake across the building, so they cannot shrink indefinitely. And each extra row of interior columns adds footings, anchor bolts and erection work. Tonnage is the right yardstick, but it should be compared on the same design basis: same wind speed and terrain, same deflection limits, same load combinations. Our guide to tapered frame design covers the other levers that decide weight.
Cranes and the column grid
Cranes change the picture more than any other load.
- Clear span with cranes. Crane brackets sit on the main columns. The column now carries vertical wheel loads at an eccentricity, lateral surge across the building and longitudinal braking forces along it. Column size is often governed by the crane cases and by the horizontal deflection limit at crane rail level.
- Multi-span with cranes. If cranes run in each bay, the interior columns can no longer be simple pinned props. They must carry runway beams, eccentric moments and surge, so they become fixed or moment-resisting columns. Much of the weight advantage of a modular frame can be lost.
- Crane coverage. A crane cannot pass an interior column line. If one crane must serve the full width, clear span is the only practical option.
Crane loads, impact allowances and surge are set by IS 875 Part 2 and the crane data from the manufacturer. Always get the actual wheel loads and crane class before fixing the frame type; a guessed crane can make the comparison meaningless.
Foundations and site
A clear span portal pushes outward at its bases under gravity load, especially with pinned bases. That horizontal thrust must go somewhere: into the footing and soil, into a tie beam between opposite columns, or into the floor slab when the detail allows it. Wider spans give larger thrust. A multi-span frame spreads load over more columns, and the pinned interior columns mostly deliver vertical load, which is easier to carry on poor soil.
On a site with weak or variable soil, more but smaller footings can be easier to build than a few heavy ones. On a site with rock close to the surface, the extra excavation for interior footings may cost more than the steel it saves. See PEB foundations and anchor bolts for how base reactions are handed over to the foundation designer.
How to choose, step by step
- Draw the use first. Mark racking, machines, aisles, crane coverage and future expansion on the plan. Any area that must stay free of columns decides the clear span zones.
- Find the acceptable column lines. If the process runs in bays or the racking repeats on a fixed module, interior columns can often sit along the rack backs or between bays without hurting anything.
- Get the crane data. Capacity, span, wheel loads, duty class and whether one crane must cover the full width.
- Run both options on the same basis. Same wind (see IS 875 Part 3 wind load for PEB), same seismic zone, same deflection limits. Compare frame tonnage and also secondary steel, footings and drainage.
- Look at the roof. Very wide clear spans push the ridge up; a multi-gable roof keeps it down but adds valley gutters that need maintenance.
- Decide with the owner. The lightest frame is not always the right building. A column in the wrong place can cost more over the life of a warehouse than the steel it saved.
Common mistakes
- Comparing a clear span quote with a modular quote on different loads. One supplier may have used a lower wind speed or looser deflection limits.
- Adding interior columns late. If the layout is fixed after the frame design, columns end up in aisles.
- Forgetting the end walls. Gable end frames and wind columns are designed separately and add their own weight in both options.
- Ignoring expansion. If the building will be extended sideways later, the frame type and the outer column design must allow for it.
Software can run both options in minutes, and in Ganithva the engineer reviews and approves the frame that goes forward. The decision itself is a planning one: start from how the building will be used, then let tonnage settle the close calls.
Frequently asked questions
Is a multi-span PEB always lighter than a clear span PEB?
Usually, for the same building width and loads, because interior columns shorten the rafter spans and reduce bending moments. The saving can disappear if the interior columns carry cranes, if the column grid fights the layout, or if extra foundations and valley drainage add cost elsewhere.
Are interior columns in a multi-span frame pinned or fixed?
In most modular PEB frames the interior columns are pinned at the base and at the rafter, so they act mainly as props carrying axial load. Sway stability then comes from the outer columns and the continuous rafter. Fixed interior columns are used when the frame needs extra stiffness, for example under cranes.
Can a clear span PEB carry an overhead crane?
Yes. Cranes are commonly carried on brackets fixed to the main columns of a clear span frame. The crane loads, surge and deflection limits then govern the column size, so the frame is checked for the crane cases as well as wind and seismic loads.