title: "Dead, live and collateral loads on a PEB roof"
description: "Gravity loads on PEB roofs in India: dead load, IS 875 Part 2 roof live load for sloped roofs, and collateral loads like services, ceilings and solar panels."
url: https://ganithva.com/blog/dead-live-and-collateral-loads-peb-roof
---

# Dead, live and collateral loads on a PEB roof: what to include and why

Wind gets most of the attention in PEB design, but gravity loads decide the purlins, the rafter depth at the ridge and, very often, the arguments after handover.

16 NOVEMBER 2026 · 7 MIN READ

**Key points**

- Gravity loads on a PEB roof are dead load, imposed (live) load to IS 875 Part 2, and collateral load from services, ceilings, insulation added later and solar panels.
- For sloping PEB roofs without access, IS 875 Part 2 reduces the imposed load as the slope increases, down to a minimum value; gentle slopes around 1 in 10 stay close to the base value.
- Collateral load on a PEB roof is a uniform allowance for light services, while heavy items such as air handling units, monorail hoists or pipe racks should be modelled as point or line loads at their real positions.
- Rooftop solar panels on a PEB should be treated as permanent collateral load, with their extra wind load and clamp point loads checked; providing for them at design stage costs far less than a retrofit.
- Wind uplift on a PEB roof is checked with dead load only, because the roof may be empty when the strongest wind arrives.

A pre-engineered building roof looks simple: purlins, sheeting and a few skylights. The gravity loads on it are the starting point for every member, and they are easy to get wrong in two directions. Too little and the purlins sag or the client cannot hang the sprinkler system they planned. Too much and every frame in the building carries steel nobody needs.

This post covers the three gravity load types on a PEB roof: **dead load**, **imposed (live) load** under IS 875 (Part 2), and **collateral load**.

## Dead load: the weight of the building itself

Dead load is the weight of everything that is permanently part of the structure and the envelope. For a PEB roof it includes:

- **Roof sheeting**: profiled single-skin sheet, or a double-skin or sandwich panel system.

- **Insulation**: glass wool, rock wool or PU/PIR cores in sandwich panels.

- **Purlins** and their sag rods and bracing.

- **Skylights, ridge vents and turbo ventilators**.

- **Self-weight of the main frames**, which most analysis programs add automatically from the section properties.

Use the actual sheet and panel weights from the manufacturer’s data rather than a round figure. A sandwich panel roof can weigh several times more than a single-skin sheet, and the difference matters on long-span frames.

Unit weights of materials are given in **IS 875 (Part 1)**. When the frame self-weight is added by software, make sure the purlins and sheeting are added as a separate load and are not counted twice.

## Imposed load on the roof: IS 875 (Part 2)

The imposed load (live load) on a roof is not about people working there every day. It covers maintenance workers, tools, materials stacked during repairs and the occasional crowd on a flat roof.

IS 875 (Part 2) separates roofs into two types:

- **Roofs with access** for use, such as a terrace. These carry a higher imposed load.

- **Roofs without access** other than for maintenance. Almost every PEB roof falls in this group.

For sloping roofs without access, the code sets a base imposed load for low slopes and **reduces it as the slope increases**, down to a minimum value. The reasoning is that steep roofs cannot hold stacked material or many people. Most PEB roofs have gentle slopes, typically around 1 in 10, so the reduction is small and the load stays close to the base value.

Two points from practice:

- **Purlins and sheeting** also need a check for a concentrated load representing a person standing on the sheet, as the code and the sheeting manufacturer require.

- **Imposed load and wind do not always act together.** Wind uplift is checked with dead load only, because the roof may be empty when the strongest wind arrives.

The imposed roof load does not go into the seismic weight under IS 1893. See [IS 1893 seismic load for PEB](https://ganithva.com/blog/is-1893-seismic-load-for-peb) for what does.

## Collateral load: the load nobody draws

Collateral load is the weight of things that are not part of the building structure but hang from it or sit on it for most of its life. It is a concept borrowed from metal building practice, and Indian PEB suppliers use it widely, even though IS 875 does not use the term. Legally it is part of the dead load; it is listed separately so that the client and designer agree on it.

Typical collateral loads:

| Item | How it loads the roof |

| Fire sprinkler pipes (full of water) | Line loads along purlins or frames; point loads at hangers |

| HVAC ducts and air handling units | Line loads; heavy point loads for units |

| Cable trays and bus ducts | Line loads along frame lines |

| Lighting and fans | Small, spread point loads |

| False ceiling and its grid | Uniform load over the ceiling area |

| Rooftop solar panels and mounting | Uniform load plus point loads at clamps or rails |

| Process piping and hoists | Heavy point loads; treat as separate cases |

A **uniform collateral allowance** over the whole roof covers light services spread across the area. Anything heavy, such as an air handling unit, a monorail hoist or a large pipe rack, should be modelled as a **point or line load at its real position**. A uniform allowance hides those loads and lets the purlin or rafter near them fail a proper check.

### Solar panels deserve their own discussion

Rooftop solar is now common on Indian warehouses and factories, often added a few years after the building is handed over. A solar installation adds:

- The dead weight of panels, rails and clamps.

- **Extra wind load**, including uplift on the panels themselves and changed pressure on the roof below.

- Point loads at the clamp positions on the sheet or purlin.

- Maintenance access loads along walkways.

If the owner might add solar later, ask at the design stage and include it. Retrofitting a roof that was designed for sheeting alone is far more expensive than providing for the load in the first design. The panel supplier’s data sheet gives the actual weight; use it rather than a guess.

## Agreeing loads with the client

Most disputes about PEB roofs trace back to loads that nobody wrote down. Before design starts, put the following in the design basis and get the client to confirm it:

- Roof sheeting and insulation system, with the product and thickness.

- Roof imposed load, and whether any area has access.

- Uniform collateral load, with a list of what it is meant to cover.

- Each heavy item with its weight and position, or a statement that there is none.

- Whether solar panels are included now or planned later.

- Any hung equipment, monorails or hoists.

This list also becomes the reference when the services contractor asks, months later, whether a new duct can be hung from the purlins.

## How gravity loads affect steel weight

Gravity loads go straight into the frame tonnage. Purlins are usually sized by the larger of gravity and wind uplift; rafters near the ridge and the knee are sized by gravity combinations on many buildings, especially in low-wind regions. Over-specifying the collateral allowance adds steel to every frame in the building, while under-specifying it creates a building that cannot take the services it was built for.

The right answer is a realistic number backed by a list of services, plus point loads for heavy items. Our guides on [tapered frame design](https://ganithva.com/guides/peb-optimization) and [steel take-off and tonnage estimation](https://ganithva.com/guides/peb-steel-take-off-tonnage-estimation) show how load assumptions flow through to weight.

## Combining gravity loads

Dead, collateral and imposed load are combined with wind, seismic and crane loads using the limit state factors in IS 800. Collateral load is usually grouped with dead load in the strength combinations. In the uplift case, practice varies: some designers leave collateral load out because services may be removed, others keep a part of it. State your approach. See [load combinations for PEB to IS 800](https://ganithva.com/blog/load-combinations-for-peb-is-800) for the full list.

## Quick checklist

- Use manufacturer weights for sheeting, panels and insulation.

- Apply the IS 875 (Part 2) roof imposed load for the roof type and slope.

- Agree a uniform collateral allowance and list what it covers.

- Model heavy services and equipment as point or line loads.

- Ask about solar panels now, not after handover.

- Decide how collateral load is treated in the uplift case and record it.

## Frequently asked questions

### What is a collateral load in a PEB?

A collateral load is a permanent or semi-permanent load other than the building's own structure: sprinkler pipes, ducts, cable trays, lighting, false ceilings, insulation added later and solar panels. It is applied as a uniform allowance on the roof plus point loads for anything heavy.

### Does the roof live load reduce with slope?

Yes. IS 875 (Part 2) reduces the imposed load on sloping roofs without access as the slope increases beyond a threshold, down to a minimum value. Roofs with access for maintenance or use carry a higher load. Check the current edition for the exact values.

### Should solar panels be treated as live load or collateral load?

Treat the panels and their mounting structure as a permanent collateral load, because they stay on the roof for years. Also check the extra wind load on the panels and the point loads at their supports on the purlins.